The operation process of Marine airbag launching
(1) The mooring cable will fasten the hoisting motor pulley block. Mooring lines should meet towing requirements and must be introduced from the bow and tied to strong components such as bollards.
(2) When the air bags are inserted into the top air bags between the launching piers of the ship, the number of air bags should meet the requirements of the jacking pressure.
(3) Lift the bottom of the ship with air bag inflation to about 5 cm from the dock.
(4) Remove all debris and effects under the vessel, and remove all points of the vessel, and impede the rolling of the airbag.
(5) Remove all piers under the ship and fill the rolling airbag with the calculated airbag fender. Finally, the weight of the airbag launch pad presses down on the rolling airbag.
(6) The crew of the ship's airbag launching using the ship's airbag shall complete the operations of boarding the ship, removing the escalator, and approaching the bridge.
(7) The hoist slowly placed the rope on the shore, and then slid the boat to the water's edge, and the boat started.
(8) Cut off the cable or dishook, and the ship quickly slides into the water of the ship's airbag;
(9) Recall all airbags;
(10) Measure the draft of the ship raft and check whether the tank is leaking.